Power Infrastructure Solutions

Power Infrastructure Solutions

Factory-direct assemblies for high voltage builds

Construction Innovations delivers power infrastructure as coordinated, factory-integrated systems designed to improve installation efficiency, reduce risk, and ensure reliable performance. We support substation and switchyard projects by aligning engineering, fabrication, and delivery, ensuring every component arrives ready to install, in sequence with construction progress. The result is safer execution, reduced field complexity, and more predictable outcomes across high-voltage projects.

Complete Control Enclosure

Complete Control
Enclosure

Control Cabling System

Control Cabling
System


Transformer Assembly

Transformer
Assembly


Low side + high side skids

Low Side + High
Side Skids


Gen-Tie T&D Assemblies

Gen-tie
T&D Assemblies


Bus Assemblies

Bus
Assemblies


Integrated Switchyard Skids

Integrated
Switchyard Skids

Acceptance testing + commissioning

Factory Acceptance
Testing &
Comissioning

Substation
Solution Menu

What we build to power projects
without schedule delays or scope gaps:
Primary & Secondary Power
Protection & Control
Grounding, Raceways & Commodities

Integrated Switchyard Skids

Interconnection + Distribution Connection Skids
15kv - 38kv

Complete distribution-level systems engineered for immediate deployment. With pre-mounted switchgear, fault interruption, metering, SCADA head-end equipment, cable management, and our Issued for Installation™ drawing package, each skid arrives as a complete assembly ready to set in place and connect without interruption.

35kV Two Circuit Switchyard Skid

35kV Two Circuit Switchyard Skid

15kV Switchyard Hybrid Skid - Sungrow Central

15kV Switchyard Hybrid Skid - Sungrow Central

Craning complete skid onto project site - drop + connect

Craning complete skid onto project site - drop + connect

35kV Two Circuit Switchyard Skid

35kV Two Circuit Switchyard Skid

Fully integrated,
factory-assembled
control buildings include:

Complete
Control Enclosures

Factory-built & fully tested with relay racks and every electrical component integrated

Complete Control Buildings arrive with all electrical, controls, power support, HVAC, safety, and building systems installed, wired, and tested in the factory to minimize field work and commissioning risk.

Fully Wired Relay Racks

Fully Wired
Relay Racks

Fully Wired Marshalling Cabinets

Fully Wired
Marshalling Cabinets

AC/DC Power
Distribution System

Integrated grounding

Integrated
grounding

HVAC-Climate control

HVAC/Climate
control

Acceptance testing & commissioning

Acceptance testing
&
commissioning

Complete Control Enclosures include:

Consistent results
across complex environments

No two projects are the same, but our results are consistent:
Projects delivered with greater speed, control, and confidence.

50-149MW

Franklin PV + Energy Storage

Idaho’s largest solar project built on-time in brutal conditions
25

Weeks

20

Megawatts

0

Available Electrician

Rocky soil, constant rain, 120MW without schedule buffer.

SOLV Energy turned to CI to optimize the eBOS and underground infrastructure for the Franklin PV + BESS project, where rocky soil and persistent wet conditions threatened productivity and schedule certainty.

We worked directly with the EOR to design and fabricate custom, fully integrated underground assemblies, which were further refined by the real-time feedback from onsite field teams during the project build. By minimizing in-field fabrication and simplifying installation, we kept crews moving despite adverse conditions—reducing rework, maintaining safety, and holding the schedule when the environment pushed back.

Franklin PV
Risks Removed
Secret Weapon
Hero Moment

SOLV built Idaho’s largest operating solar facility on-schedule, despite conditions that would’ve derailed other EPC’s timelines

150-299MW

Eldorado 1 Solar Project

Illinois’ agrivoltaics flagship site with an American-made mindset
25

Weeks

20

Megawatts

0

Available Electrician

7 months to build. 150MWac delivered. American innovation.

One of Illinois’ most visible solar projects, Eldorado Solar was layered with an agrivoltaics program, community commitments, and a focus on American-made solutions. Every system onsite had to work right the first time.

As a U.S. manufacturer, CI leveraged its in-house sourcing and procurement teams to integrate domestically-sourced components for its complete product assemblies. 150MW of eBOS solutions were deployed on Eldorado Phase 1 that integrated cleanly into tracker-driven workflows and EPC sequencing, and removed the tariff and schedule volatility of supply chain uncertainty overseas.

Eldorado 1 Solar Project
Risks Removed
Secret Weapon
Hero Moment

Sol Systems energized Eldorado with American made solutions while keeping agrivoitaics commitments and local credibility in-tact (without compromising cost).

300-450MW

Harquahala Sun Solar Projects

Simplifying multiple project phases with thousands of touchpoints
25

Weeks

20

Megawatts

0

Available Electrician

Multi-phased. 450MW. Thousands of touchpoints.

CI was brought in to create eBOS for Harquahala Sun I and II, where phased construction and massive material volume left no margin for missteps in delivery, staging, or installation sequencing.

As part of the ci360™ solution, CI designed, built, and schedule-sequenced PV eBOS kits to align with project developer Copia’s phased completion plan. Assemblies arrived job-ready to eliminate project-to-project bottlenecks and reduce in-field material handling, especially as crews moved from one phase to the next. The result: consistent output, less lost-time handling mass materials, and uninterrupted momentum across a combined 450 MW footprint.

Harquahala Sun Solar Projects
Risks Removed
Secret Weapon
Hero Moment

Copia made its critical completion milestones and developed both phases on schedule, safeguarding a 9-figure investment.

450MW+

Arica + Victory Pass Solar

Energizing neighboring sites with peak skilled labor shortages
25

Weeks

20

Megawatts

0

Available Electrician

Limited labor availability, remote locations, 463 MW combined.

CI was deployed to support the Arica and Victory Pass Solar projects—two neighboring, utility-scale sites where remote desert conditions, long runs, and massive system scale put intense pressure on skilled labor and material availability for the eBOS scope.

Working alongside the EOR, CI developed repetition focused, simplified eBOS assemblies and install kits built for consistent installation regardless of crew experience. With clear Issued for Installation drawings guiding field execution, we reduced installation variability, controlled schedule risk, and enabled delivery at scale without compromising quality.

Arica + Victory Pass Solar
Risks Removed
Secret Weapon
Hero Moment

Clearway energized Arica on-schedule despite a remote site location with constrained material and skilled labor availability

Substation

UPS Regional Hub Substation

The substation timeline that other suppliers turned away
25

Weeks

20

Megawatts

0

Available Electrician

25 weeks. 20 megawatts. 0 available electricians.

CI jumped in to help Hunt Electric complete a high voltage substation for UPS with just 25 weeks to design, fabricate, test, and build. By manufacturing and pre-testing modular substation assemblies in our facility ahead of time, CI was able to provide Hunt with a turnkey solution that shaved weeks off construction and delivered full energization right on schedule, even with a green install crew who’d never worked in high voltage before.

Risks Removed
Secret Weapon
Hero Moment

Hunt Electric built UPS’ substation in record time using just 4 first time crew members who’d never built a substation before

Recent Power Projects

Case Study 1

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’,

Size

20-500KW

Type

Solar eBos

State

Texas

Completion Date

17/12/2025

Case Study 2

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’,

Size

20-500KW

Type

Solar eBos

State

Texas

Completion Date

17/12/2025

Case Study 3

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’,

Size

20-500KW

Type

Solar eBos

State

Texas

Completion Date

17/12/2025

Case Study 4

It is a long established fact that a reader will be distracted by the readable content of a page when looking at its layout. The point of using Lorem Ipsum is that it has a more-or-less normal distribution of letters, as opposed to using ‘Content here, content here’,

Size

20-500KW

Type

Solar eBos

State

Texas

Completion Date

17/12/2025

How can we support your next project?

A proven approach for shorter and safer power project builds
data-icon-1
Factory-tested and QC'd before delivery
data-icon-2
Elimination of field-based fabrication and rework
data-icon-3
Reduced construction duration and installation risk
data-icon-4
Simple enough for crews of any experience level

By organizing our power scope with the ci360™ approach, crews are able to install these systems, uninterrupted, without the risk of missing parts or rework under critical project deadlines.

Bring greater speed and certainty to your next power project.