Our solar eBOS solutions are deployed across utility-scale projects nationwide, delivering simplified installation, reduced risk, and significant cost savings. Scroll to explore the data behind our performance.


Based on 300 MWac project size.
ci360™ solutions minimize field labor by delivering fully integrated, factory-built assemblies complete with all required components. Paired with Issued For Installation™ drawings, our systems enable faster, more consistent implementation in the field.
How much could your next project save?
ci360™ can reduce 50% of the eBOS installation labor hours required for a 100-249MWac site — enabling you to do twice as much with your current crew.
This translates to a substantial increase in installation velocity.

ci360™ can reduce 55-60% of the eBOS installation labor hours required for a 250-499 MWac site — giving your onsite crews extra breathing room when construction happens.
Snowstorms? Module delays? Challenging soil? No problem.

ci360™ can reduce over 60% of the eBOS installation labor hours required for project sites 500MW and larger — providing the highest $MM savings for the biggest deal projects.
That’s a win worth 8 digits.

The Combiner Harness™ at the core of the ci360™ eBOS solar solution is the only overmolded trunk bus strong enough to be buried directly and energized without interruption on both above-ground and underground solar sites.
The proof is in the performance ↓
The Combiner Harness boasts a node failure rate of just 0.017% across all projects
Every Combiner Harness™ that leaves our loading dock gets submerged and QC’d before shipment
The first and only trunk bus solution UL listed for direct burial applications
Designed by electricians,
for electricians
in Sacramento, CA
ci360™ delivers what others can't; a comprehensive, fully integrated system designed to perform across every phase of the project, from installation through long-term operation.
Compare for yourself↓
| ci360™ complete solution | Plug & Play 'solutions' provider | Plug & Play trunkbus provider | |
|---|---|---|---|
| DC COLLECTION TRUNKBUS | ![]() | ![]() | ![]() |
| UPFRONT DESIGN ASSIST | ![]() | ![]() | ![]() |
| KITTED COMPONENT ASSEMBLIES | ![]() | ![]() | ![]() |
| COMPLETE INSTALLATION KITS | ![]() | ![]() | ![]() |
| CONSTRUCTION sequenced DELIVERIES | ![]() | ![]() | ![]() |
| 3D-MODEL GOLDEN ROW | ![]() | ![]() | ![]() |
| Issued for Installation™ Drawings | ![]() | ![]() | ![]() |
| ONSITE FIELD TEAMS | ![]() | ![]() | ![]() |
| EVERY electrical SCOPE ON THE SOLAR FIELD | ![]() | ![]() | ![]() |
ci360™ is our fully integrated delivery model, designed to support every stakeholder involved in project delivery, from estimating and engineering through construction and operations. While individual products can be deployed independently, ci360™ brings together engineering, manufacturing, and field support into a coordinated system that delivers the highest level of performance and consistency.
Rather than optimizing for a single function, this comprehensive approach improves coordination, reduces risk, and drives better outcomes across the entire project team.
Explore how ci360™ supports your role.
For estimating teams focused on delivering accurate, competitive bids, uncertainty creates unnecessary risk. Our estimate provides clear, reliable pricing with no hidden costs or unexpected changes, allowing you to build proposals with confidence. By reducing field labor requirements by 50–60%, our integrated solutions help simplify cost assumptions and improve bid accuracy, so your team can focus on winning work, not managing revisions.

Villians Removed

Secret Weapons

Hero Moment

For engineering teams, performance in the field is the ultimate measure of success. ci360™ complete design support optimizes system performance from the outset, addressing critical factors such as voltage drop, system efficiency, and long-term reliability.

Villians Removed

Secret Weapons

Hero Moment

For procurement teams tasked with managing cost, availability, and supplier coordination, ci360™ simplifies sourcing by delivering a fully integrated electrical solution through a single partner. This reduces vendor complexity, improves cost predictability, and minimizes excess and obsolete inventory, supporting more efficient procurement at scale.

Villians Removed

Secret Weapons

Hero Moment

For construction teams focused on maintaining safe, productive job sites, minimizing field variability is key. ci360™ reduces on-site fabrication by delivering fully integrated, factory-built assemblies supported by clear documentation and complete installation scope. This approach improves efficiency while helping reduce safety risk and support lower incident rates across the project.

Villians Removed

Secret Weapons

Hero Moment

For project managers responsible for schedule, cost, and execution, maintaining control across every phase is critical. ci360™ Project and Field Teams work alongside yours to support coordination from design through project closeout. By aligning scope, delivery, and field execution, we help protect project timelines, maintain budget integrity, and reduce disruption, so your team can focus on delivering a successful project.

Villians Removed

Secret Weapons

Hero Moment

For operations teams responsible for system reliability and uptime, long-term performance starts with how systems are designed and built. ci360™ solutions are engineered to centralize serviceable components and simplify access in the field, making maintenance more efficient and controlled.

Villians Removed

Secret Weapons

Hero Moment

For owners and developers, long-term value depends on consistent execution and reliable system performance. With over a decade of proven project delivery, ci360™ supports more predictable energization timelines and optimized Levelized Cost of Energy (LCOE) across the life of the asset.

Villians Removed

Secret Weapons

Hero Moment

From string wire to substations, we’ve built ci360™ kits with turn-key electrical solutions for a project just like yours.

After you submit your project details, our engineering team will review your specs and send you a completed design of your ci360™ electrical solutions.

We’ll coordinate our eBOS deliveries so your ci360™ kits will arrive at the exact block you're working on, sent in-sync with your construction schedule.

Just unbox, follow our Issued for Installation drawings, and build without interruption (even with first-time crews).

Fewer incidents, less lost-time, and 50-60% faster installs are worth rewarding. See the proven value of ci360™ across all sectors

With assemblies designed by former field electricians, we know where the gaps lie in so-called “complete” solutions. We build ci360™ assemblies that arrive onsite ready for any level of field craft to safely and efficiently install.
Here’s how our products compare:



ci360™ is built with safeguards shaped by decades in the field —
designed to reduce the biggest, most preventable risks before they have a chance to derail the job.

ci360™ brings engineering, coordination, and system definition together early in the project lifecycle. By working closely with your team and the EOR to optimize and model the full system, we help eliminate design gaps before they impact downstream phases, reducing risk and improving overall project efficiency.

Materials only add value when they arrive in alignment with the construction plan. When quantities, components, or delivery sequencing are not coordinated, even small discrepancies can disrupt progress and impact productivity. ci360™ integrates sourcing into a unified system, ensuring materials are specified accurately, fully accounted for, and delivered in the correct sequence to support efficient field execution.

Uncoordinated material delivery can create inefficiencies in the field, requiring crews to spend time sorting, staging, and locating components instead of progressing work. Missing or misplaced items can further disrupt productivity and delay installation. ci360™ addresses this by delivering materials in fully coordinated, labeled kits, sent directly to the point of use and aligned with the construction sequence. This approach reduces unnecessary handling, improves material visibility, and keeps crews focused on execution.

Field-based fabrication introduces variability, requiring crews to measure, cut, and modify components in dynamic jobsite conditions. ci360™ shifts this work upstream, delivering factory-built assemblies produced in a controlled environment. This approach reduces the need for field fabrication, improves quality and consistency, and minimizes safety exposure during installation.

Traditional eBOS installation requires significant field labor to coordinate, assemble, and install large volumes of components. ci360™ reduces these demands by delivering pre-integrated, installation-ready systems aligned to the construction sequence. By minimizing on-site assembly and simplifying execution, our approach helps reduce field labor requirements, improve crew productivity, and accelerate overall project timelines.

When testing is deferred to the final stages of a project, issues can surface at the most critical point in the schedule, impacting milestones and requiring rework under time pressure. ci360™ addresses this by performing comprehensive testing and quality control in a controlled environment before systems are delivered to the field. As a result, field testing becomes a confirmation of performance—not a point of discovery—supporting more predictable project execution.

Schedule and budget performance are often impacted by risks introduced throughout the project lifecycle. ci360™ addresses these challenges upfront, reducing design gaps, material misalignment, installation variability, and late-stage quality issues before they impact project outcomes. Our support continues through project closeout, with dedicated project teams working alongside yours to maintain alignment, protect schedules, and ensure successful delivery.