Data Center Infrastructure

Factory-integrated systems designed for speed, precision, and scale

Factory-integrated systems designed for speed, precision, and scale​

Designed to Accelerate Data Center Delivery

Pre-integrated systems that reduce field complexity and speed deployment
Data Center Solutions Page Image

Traditional field-built infrastructure introduces variability, labor constraints, and coordination challenges. We replace this model with pre-integrated systems that shift complexity into a controlled manufacturing environment.

Power distribution, medium-voltage infrastructure, cabling, pathways, and IT assemblies are delivered as:

  • Pre-assembled skids
  • Labeled, plug-and-play cable systems
  • Coordinated commodity kits aligned to scope and location

All components are delivered in sync with site progress and supported by on-site CI field specialists to maintain installation continuity and resolve issues in real time.

By organizing infrastructure as defined assemblies rather than individual components, we enable:

  • Simplified logistics and material management
  • Reduced on-site labor requirements
  • Compression of critical path activities
  • More predictable, repeatable project execution

This approach is specifically aligned to the demands of large-scale, schedule-driven data center construction.

Data Center Solutions

Fully integrated systems across all major infrastructure scopes
Power Collection & Distribution
Medium-voltage Infrastructure
IT and Network
Distribution Frames
Underground Routing Infrastructure

What can we deliver for your next data center?

A proven approach adapted to power mission-critical expansion

Construction Innovations has delivered medium- and high-voltage and energy infrastructure systems across a wide range of large-scale projects nationwide. Our approach builds on this experience to support the evolving demands of modern data center development.

data-icon-1
Factory-tested and QC'd before delivery
data-icon-2
Elimination of field-based fabrication and rework
data-icon-3
Reduced construction duration and installation risk
data-icon-4
Simple enough for crews of any experience level

Factory-integrated, turnkey solutions for
Solar Power Data Centers Conventional Energy

Show All
0.5 MWDC
1.8 MWDC
10 MWDC
10.5 MWDC
100 MWDC
105 MWDC
108 MWDC
11 MWDC
11.2 MWDC
110.9 MWDC
112 MWDC
12 MWDC
129.7 MWDC
129.9 MWDC
13.1 MWDC
13.3 MWDC
130 MWDC
131 MWDC
133 MWDC
135 MWDC
135.3 MWDC
138 MWDC
139 MWDC
140 MWDC
156.5 MWDC
158.6 MWDC
16.5 MWDC
165 MWDC
17 MWDC
175 MWDC
177 MWDC
180 MWDC
19 MWDC
19.2 MWDC
191 MWDC
196.5 MWDC
200 MWDC
202.5 MWDC
207 MWDC
21 MWDC
210 MWDC
22 MWDC
227 MWDC
231.04 MWDC
24 MWDC
24.7 MWDC
249.6 MWDC
249.9 MWDC
25 MWDC
258.3 MWDC
259.9 MWDC
26 MWDC
26.5 MWDC
265 MWDC
266 MWDC
27 MWDC
28 MWDC
29 MWDC
3 MWDC
31 MWDC
314 MWDC
32 MWDC
325 MWDC
331 MWDC
339 MWDC
344.1 MWDC
35 MWDC
350 MWDC
369.3 MWDC
378.9 MWDC
38 MWDC
38.7 MWDC
4 MWDC
41.8 MWDC
480 MWDC
49.4 MWDC
5 MWDC
50.2 MWDC
50.4 MWDC
51.2 MWDC
53 MWDC
57 MWDC
6 MWDC
6.1 MWDC
6.5 MWDC
60.7 MWDC
64.5 MWDC
65 MWDC
68 MWDC
7 MWDC
7.5 MWDC
7.53 MWDC
75 MWDC
76 MWDC
78 MWDC
84 MWDC
89.1 MWDC
91 MWDC
93.7 MWDC
96.7 MWDC
99.97 MWDC
Show All
ALABAMA
ARIZONA
CALIFORNIA
COLORADO
CONNECTICUT
FLORIDA
GEORGIA
HAWAII
IDAHO
ILLINOIS
INDIANA
MINNESOTA
MISSISSIPPI
NEVADA
NEW-MEXICO
NORTH-CAROLINA
OHIO
OREGON
TEXAS
UTAH
WASHINGTON
WISCONSIN
WYOMING
Show All
2011
2012
2013
2014
2015
2016
2017
2018
2019
2020
2021
2022
2023
NameCityState MWDC / Size Completion Date
Wildflower 3 Walls MISSISSIPPI 131 2021
Elara Pearsall TEXAS 177 2021
Sandy Branch Houston TEXAS 140 2022
Brazoria West Damon TEXAS 265 2022
Brazoria County Damon TEXAS 265 2023
Eiffel Paris TEXAS 314 2023
Seven Sisters Solar Various UTAH 22 2015
Red Hills Solar Parowan UTAH 105 2015
Three Peaks Solar Cedar City UTAH 108 2016
Cove Mountain 1 Enterprise UTAH 75 2020
Buckthorn Solar Pecos County TEXAS 196.5 2018
Cove Mountain 2 Enterprise UTAH 158.6 2020
Lapetus Andrews County TEXAS 135.3 2019
Hunter Clawson UTAH 129.7 2020
Prospero Andrews County TEXAS 378.9 2020
Red Mesa Montezuma Creek UTAH 93.7 2023
Impact Deport TEXAS 259.9 2020
Adams Neilson Lind WASHINGTON 28 2018
Taygete 1 Coyanosa TEXAS 344.1 2021
Onion River Cedar Grove WISCONSIN 180 2023
Taygete 2 Coyanosa TEXAS 258.3 2021
Crawfish River Jefferson WISCONSIN 91 2023
Prospero 2 Andrews TEXAS 331 2021
Sweetwater Green River WYOMING 99.97 2018
Big River 1 Enfield ILLINOIS 207 2022
Dodge Flats Reno NEVADA 200 2022
Big River 2 Brownsville ILLINOIS 112 2022
Big Plain London OHIO 266 2023
Lake Village Solar Lake Village INDIANA 0.5 2013
Lakeview 500 Solar Lakeview OREGON 0.5 2013

This website uses cookies

We use cookies to personalize content, provide social media features, and analyze our traffic. We also share information about your use of our site with our analytics partners. You can change your preferences at any time.