Factory-integrated systems designed for speed, precision, and scale


Traditional field-built infrastructure introduces variability, labor constraints, and coordination challenges. We replace this model with pre-integrated systems that shift complexity into a controlled manufacturing environment.
Power distribution, medium-voltage infrastructure, cabling, pathways, and IT assemblies are delivered as:
All components are delivered in sync with site progress and supported by on-site CI field specialists to maintain installation continuity and resolve issues in real time.
By organizing infrastructure as defined assemblies rather than individual components, we enable:
This approach is specifically aligned to the demands of large-scale, schedule-driven data center construction.
Construction Innovations has delivered medium- and high-voltage and energy infrastructure systems across a wide range of large-scale projects nationwide. Our approach builds on this experience to support the evolving demands of modern data center development.




We bring structure and predictability to installation, reducing errors and keeping projects on schedule.
| Name | City | State | MWDC / Size | Completion Date |
|---|---|---|---|---|
| Wildflower 3 | Walls | MISSISSIPPI | 131 | 2024 |
| Cove Mountain 1 | Enterprise | UTAH | 75 | 2020 |
| Buckthorn Solar | Pecos County | TEXAS | 196.5 | 2018 |
| Cove Mountain 2 | Enterprise | UTAH | 158.6 | 2020 |
| Lapetus | Andrews County | TEXAS | 135.3 | 2019 |
| Hunter | Clawson | UTAH | 129.7 | 2020 |
| Prospero | Andrews County | TEXAS | 378.9 | 2020 |
| Red Mesa | Montezuma Creek | UTAH | 93.7 | 2023 |
| Impact | Deport | TEXAS | 259.9 | 2020 |
| Adams Neilson | Lind | WASHINGTON | 28 | 2018 |
| Taygete 1 | Coyanosa | TEXAS | 344.1 | 2021 |
| Onion River | Cedar Grove | WISCONSIN | 180 | 2023 |
| Taygete 2 | Coyanosa | TEXAS | 258.3 | 2021 |
| Crawfish River | Jefferson | WISCONSIN | 91 | 2023 |
| Prospero 2 | Andrews | TEXAS | 331 | 2021 |
| Sweetwater | Green River | WYOMING | 99.97 | 2018 |
| Elara | Pearsall | TEXAS | 177 | 2021 |
| Sandy Branch | Houston | TEXAS | 140 | 2022 |
| Brazoria West | Damon | TEXAS | 265 | 2022 |
| Brazoria County | Damon | TEXAS | 265 | 2023 |
| Eiffel | Paris | TEXAS | 314 | 2023 |
| Seven Sisters Solar | Various | UTAH | 22 | 2015 |
| Red Hills Solar | Parowan | UTAH | 105 | 2015 |
| Three Peaks Solar | Cedar City | UTAH | 108 | 2016 |
| Shawboro Solar | Shawboro | NORTH-CAROLINA | 29 | 2015 |
| Garrett | Lakeview | OREGON | 13.1 | 2019 |
| BayWa Solar | Newton Grove | NORTH-CAROLINA | 53 | 2016 |
| Grandview Solar | Boise | IDAHO | 108 | 2016 |
| Broad River | Mooresboro | NORTH-CAROLINA | 68 | 2021 |
| Capital Dynamics Solar | Various Cities | IDAHO | 130 | 2017 |